POOL OPENING OPTIONS

399+tx
FULL
Remove water and debris from pool cover; leaves bagged and placed at side of house
Power wash pool cover and water bags (safety covers sprayed prior to removal)
Fold and stand cover upright for drainage (unless otherwise requested)
Reinstall ladders and handrails; clean liner and stair waterline
(some staining may remain)
Remove winterizing items; reinstall and test equipment for leaks and proper operation (water level permitting)
Shock pool water and perform
general cleanup
Power wash first 3 feet of pool deck

349+tx
PARTIAL
Includes everything in our Full Pool Opening, except the pool cover must be cleared
of water and debris prior to our arrival.

250+tx
EQUIPMENT ONLY
Reinstallation of all related equipment,
with system start-up to test for leaks
and proper operation
$25
off list price when you pay
by March 23, 2026!
SAVE!
POOL CLOSING OPTIONS

FULL
Draining of water to appropriate levels
Removal of deck equipment
(except diving boards)
Winterizing of plumbing lines
& pool equipment
Secure installation of winter cover
Shocking of pool water

PARTIAL
Includes all services outlined in a full pool closing, with the exception that the homeowner is responsible for lowering
the pool water to the appropriate level prior
to service

EQUIPMENT ONLY
Thorough blowout of pool plumbing lines
and complete winterization of
pool equipment
To ensure the best results, pool vacuuming
is available as an optional add-on service.
VACUUMING


Extra winter cover installation
Spill-over spa closing
Cartridge filter cleaning
Salt cell cleaning
Winter chemical kit (highly recommended)
Closing of waterfall, deck jets, or other water features